Get StartedHelp & Guide

Route Builder

Design the sequence of operations and assign BOM materials to each step.

Operations Sequence

Drag to reorder operations or add new steps.

#
Operation
Work Center
Setup(m)
Run(m/u)
1
2
3
Parallel
4
5

No BOM Selected

Select a BOM in the Route Details panel to assign materials to each operation.

Route Details

Summary Metrics

Total Steps5 Ops
Total Est. Time55.5 mins
QC Checkpoints1 point

Route Validated

Sequence is valid, work centers are assigned. Ready to save.