WAC Cost Breakdown

Cycle: CYC-2026-05-A ·  May 2026 — Week 1–3

Cycle Day

22

Accepted Units

8,240

Cycle Cost

LKR 1,236,000

Est. Cost/Unit

LKR 150.00

FG-1001Angle Broom 30cm

Per-unit cost breakdown by G/L account and cost centre

WAC — Weighted Average Cost
Cost ComponentG/L AccountCost CentreTotal Cycle Cost (LKR)Per Unit (LKR)% of Total
Raw Material (Coir / PP)1500 WIP — MaterialsCC-MFG-01618,00075.00
50.0%
Machine Operation (Energy)1510 WIP — MachineCC-MFG-01148,80018.06
12.0%
Direct Labour (Permanent)1520 WIP — LabourCC-MFG-01280,00033.98
22.7%
Maintenance (Allocated)1530 WIP — MaintenanceCC-MAINT62,0007.52
5.0%
Packing (Carton + Wrap)1500 WIP — MaterialsCC-PACK148,80018.06
12.0%
Overhead Absorption6100 Factory OverheadCC-OVHD16,5002.00
1.3%
Recycling Credit (FG-3001)4200 Recycling RevenueCC-REC(38,100)(4.62)-3.1%
Net Estimated Cost / Unit (WAC)1,197,900LKR 150.00

All Products — Cycle Cost Summary

Cycle CYC-2026-05-A

Item CodeDescriptionAccepted UnitsCost / Unit (LKR)vs. Prev. CycleTrend
FG-1001Angle Broom 30cm8,240149.94153.40 2.3%
FG-1002String Mop 400g3,980189.69194.10 2.3%
FG-1003Dustpan Set5,12087.2589.80 2.8%
FG-1004Mop Handle 120cm6,60062.4061.90 0.8%