Maintenance Work Orders
Track machine breakdowns, spare parts, and repair costs
Open Work Orders
2
Machines Offline
2
Total Open Cost (LKR)
LKR 59,000
| WO No. | Machine | Issue | Spare Part | Labour Type | Labour (LKR) | Parts (LKR) | Total (LKR) | G/L | CC | Status | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| WO-2026-018 | IM-03 — Injection Moulding 3 | Hydraulic pump failure — machine stopped at 09:14 | HP-001 | Contract | 8,500 | 24,000 | 32,500 | 6300 | CC-MAINT | In Progress | |
| WO-2026-017 | IM-07 — Injection Moulding 7 | Mould clamp worn — excessive flash on parts | MC-007 | Permanent | 4,200 | 12,000 | 16,200 | 6300 | CC-MAINT | Parts Required | |
| WO-2026-016 | AS-01 — Assembly Line 1 | Conveyor belt tension loose — speed inconsistent | CB-014 | Permanent | 3,500 | 6,800 | 10,300 | 6300 | CC-MAINT | Closed | |
| Total Open WO Cost | LKR 48,700 | ||||||||||