Schedule Optimiser

AI-driven suggestions for optimal sequencing of production orders.

Total Setup Time Saved
3h 45m
Across 8 optimized sequences
Machine Utilization Gain
+6.2%
Estimated increase in OEE

Optimisation Opportunity Found (IM-01)

Running PO-0041 before PO-0043 will save 45 minutes of machine setup time by minimizing color changeovers from Blue to Red.

Proposed Sequence: IM-01

SequencePO NumberItem & ColorMould TypeSetup Time Impact
1PO-0041Floor Broom (Blue)Mould-AStandard
2PO-0043Dustpan (Blue)Mould-B-45m (No Color Flush)
3PO-0044Wiper Blade (Red)Mould-C+60m (Color Flush & Mould Change)
4PO-0046Wiper Blade (Red)Mould-C-90m (No Setup Required)
5PO-0048Toilet Brush (White)Mould-D+60m (Color Flush)